The paving of Main St in the area of the Cradock Bridge had to be rescheduled. MassDOT will be paving Main St from South Street to High Street on Friday October 19 and Saturday October 20 during the day. Expect traffic delays during these days, and take alternate routes, if possible. Thank you for your cooperation.
Powered by WPeMatico